ADUs in the Bay Area

ADU builder in Fremont

Your Fremont ADU, handled by one team.

We design, permit and build ADUs in Fremont and across Alameda County. One team handles the drawings, the engineering, the city approval and the construction.

Prefer to talk? Call (510) 453-0400

Family ADU with French doors, Fremont
Family ADU with French doors · Fremont · 749 sq ft · 2 bed · 2 bath
50+ successful projectsAcross the Bay Area
5.0 on Google18 reviews
Licensed and insuredCSLB Lic. #1095467
$1,000 depositThen you pay only for finished work

Building in Fremont

What the City of Fremont decides, and what we handle

Your lot

California law allows an ADU on most single-family lots. The City of Fremont sets the local details, like how far it must sit from your property lines and how tall it can be. We check your lot against them before you commit to anything.

Plans and approval

We submit the plans to the City of Fremont, answer every comment the city sends back, and resubmit until your permit is approved.

Fees

Permit fees are set by the City of Fremont and paid directly to the city. PG&E connection fees are paid to PG&E. Neither can be priced exactly up front, so they are not part of our price.

Inspections

The City of Fremont inspects the work at each stage. We book each inspection as the work finishes, so the site keeps moving.

Fremont is in Alameda County. Our office is in Newark. We also work in Union City, Milpitas and San Jose.

San Jose

ADUs we’ve built in Fremont and nearby

On this site you’ll find 4 finished projects in Fremont: 1 ADU, 1 kitchen and 2 bathrooms. Nearby, we’ve also finished 6 ADUs in San Jose and 3 in Pleasanton.

See all projects

ADU models

Start from one of our models

Six layouts from 450 to 1,200 sq ft. Change what you want, and we design it for your lot.

See all models

Images are 3D renderings of the base designs. Final plans are drawn for your lot after the site visit.

The short version

An ADU with Loona, in four lines

Price

$365 - $470 per sq ft, including design, engineering, permits, construction and a finish allowance of about $20,000.

See full pricing
What’s included

One team handles design, engineering, the city approval and construction, and manages every licensed crew.

See what’s included
Payments

A $1,000 deposit, then milestone payments, each one only after that work is done.

How payments work
What we build

Detached ADUs, attached ADUs and garage conversions.

Compare the three

How long it takes

Approval by the City of Fremont is the longest wait before construction, so starting the paperwork early means you can build as soon as you’re ready.

Check my lot and budget

Working with Loona

What to expect while we build

  • One point of contactFrom first drawing to move-in, one person answers your questions.
  • Updates every week, with photosPlus a note after every inspection and milestone, so you know where your project stands without asking.
  • Your private project hubPhotos, inspection reports, permits and every document in one place online, updated as the work happens. Open it anytime.
  • Payments you can see comingThe hub shows every payment made and when, and which milestone payment is next, so you can plan ahead.
  • Questions answered the same business dayCall, text or email.
Project hubDetached ADU · example
PhotosUpdated this week
Inspection reportsFraming passed
Permits and paperworkAll documents

Payment schedule

  • DepositPaid
  • Design and engineeringPaid
  • FoundationPaid
  • Plumbing and electrical (inside the walls)Upcoming
Example layout. Every client gets their own private hub.

Reviews

What our clients say

5.0 18 reviews 4.9 32 reviews 5.0 28 reviews
“Owning an older home means unexpected issues always come up, but Eric and his team never left us to figure things out alone. They were responsive, supportive, and always had solutions.”
Isaac R. · Remodels, then an ADU · Read on Google
“Great experience with Loona Construction, especially Ed and Eric. They helped me with literally everything on my project: design, plans, engineering, permits, inspections, materials…”
Amanat M. · ADU · Read on Google
“Loona Construction’s bid was the highest I’ve got, but after the completion of the job, I understood why, and I’m sure that the money spent on the project was worth every penny.”
Akylbek T. · Read on Yelp

FAQs

ADU questions from Fremont homeowners

Something else on your mind? Call (510) 453-0400, Monday to Friday, 9am to 5pm.

More ADU questions

Yes. We build in Fremont and across Alameda County. Our office is in Newark.

Most single-family lots in California can have one. The City of Fremont sets the local details, like how far it must sit from your property lines. We check your lot against them before you commit to anything.

They are set by the City of Fremont, paid directly to the city, and depend on your project, so no one can price them exactly up front. PG&E connection fees are separate for the same reason.

Typically under a year from first drawing to move-in: up to 2 months for design and engineering, 2 to 3 months for city approval, and 3 to 5 months of construction.

Nearby

ADUs in nearby cities

Next step

See what you can build on your Fremont lot.

We review every request within 1 business day. If it’s a project we take on, we call you to talk through your lot, your city’s rules and a rough budget. There’s no cost to find out.

Or call (510) 453-0400, Monday to Friday, 9am to 5pm.

Step 1 of 4

What are you building?
Call Check my lot and budget

Follow us

See what we’re building on Instagram

Follow @loona_construction for job-site updates, finished ADUs and straight answers on permits and costs across the Bay Area.

Follow us on Instagram